ÃÛ¶¹ÊÓƵ

Key metric summary key-metric-summary

The KeyMetrics Key metric summary visualization lets you see how an important metric is trending within a single timeframe. It also lets you compare metric performance across two timeframes. It provides the benefits of multiple visualizations combined into one visualization:

  • Line visualization shows how the metric is trending for the primary and comparison date ranges

  • Summary percent change shows the metric increase or decrease between the primary and comparison date ranges

  • Current total value (summary number) for the metric

This visualization addresses a variety of common use cases, including:

  • An analyst trying to understand how opportunity creation looked this month compared to the same timeframe last year.

  • A marketer exploring how lead generation for a specific lead type has changed from this month to last month.

  • An executive wanting to understand how new bookings changed from this quarter to last quarter.

Use

  1. Add a KeyMetrics Key metric summary visualization. See Add a visualization to a panel.

  2. Configure the visualization by selecting a Metric, a Primary date range, a Comparison date range (optional) and a Filter (optional):

    Key metric configuration showing the options for metric, primary date range, comparison date range, and segment.

    table 0-row-2 1-row-2 2-row-2 3-row-2 4-row-2 layout-auto
    Option Description
    Metric Select the metric you want to examine. All metrics are supported.
    Primary date range The current date range for the freeform table.
    Comparison date range The date range to which you want to compare the primary date range.
    Filter (optional) Any filter that you are specifically interested in for this summary.
  3. Select Build.

The output of the key metric summary looks like:

Key metric output showing the metic, summary change, summary number, and line graphs.

  • The Previous period line graph (always displayed in gray) corresponds to the Comparison date range in the configuration step.

  • If a comparison date range is not specified during configuration or is hidden in the visualization settings, only the line graph for the primary date range is displayed. The summary change is hidden.

  • From here, you can hover over the line graphs to see the statistics for individual days:

Configure

After building the visualization, you can edit the original configuration.

  1. Select Edit Configure visualization at the top of the visualization.

    You are taken back to the original configuration dialog.

  2. Change the settings as preferred. Select Reset to reset the current settings. Select Build to rebuild the visualization.

Settings

As part of the visualization settings, specific key metric summary settings are available.

Setting
Description
Summary display type
Select between Emphasize percent change or Emphasize number value.
Show trendlines
Show trendlines in the visualization.
Show max and min on trendlines
Show maximum and minimum value on trendlines.
Show comparison percentage and trendline
Show comparison percentage with trendline. If not selected, both are hidden.
Number value options
Show total number or Show raw difference for the number value.
Abbreviate value

Select Abbreviate value to abbreviate intelligently the number value. When selected, enter a number to define the amount of abbreviation. For example:

table 0-row-3 1-row-3 2-row-3 3-row-3 4-row-3 5-row-3 html-authored no-header
Original value Abbreviation Result
$12,011,141.25 Not selected $12,011,141.25
$12,011,141.25 Selected, set to 1 $12M
$12,011,141.25 Selected, set to 2 $12.0M
$12,011,141.25 Selected, set to 2 $12.011M
$12,011,141.25 Select, set to 3 $12.011M
recommendation-more-help
080e5213-7aa2-40d6-9dba-18945e892f79