ÃÛ¶¹ÊÓƵ

Edit an activity or save as draft

Information about the different ways you can edit an existing activity in ÃÛ¶¹ÊÓƵ Target, including saving an activity in draft form.

Target provides various places in the UI where you can edit existing activities. The process varies depending on the method you choose.

Edit an activity by using the hover button on the Activities page section_29EE2ECA6B88473A8F9AC5600FFBB174

  1. From the Activities page, hover over the activity you want to edit, then click the Edit icon.

    Edit icon

    Target opens the activity in the Visual Experience Composer (VEC) and you see the Experiences page (the first step in the three-step guided workflow).

  2. Edit the activity, as desired using the VEC options.

  3. Click the split button to advance to the next step or to save the activity.

    Split button

    • Next: To edit another page in the three-step workflow, click Next to advance to the desired step. For example, in the illustration above, clicking Next displays the Targeting step.
    • Save & Close: Make the desired changes on the current step, click the drop-down on the split button, then select Save and Close to save your changes and display the activity’s Overview page.
    • Save: Make the desired changes on a step, click the drop-down on the split button, then select Save to save your changes and remain on that step where you can continue to make changes. Wait for the save to complete before making additional changes. The VEC reloads with the refreshed changes after the save is complete.

Edit an activity by opening the activity by clicking its name on the Activities page section_176180DAD17E40CEA441903F39E0AA1C

  1. To avoid having to step through the workflow, click the desired activity from the Activities page to open it, then select an option from the Edit Activity drop-down list.

    Edit Activity drop-down

  2. Select the desired option::

    • Edit Experiences: Takes you directly to the Experiences page (the first step in the guided workflow). Make your desired changes, then use the split button (explained above) to save the activity.

      • Click Save & Close to save your changes and display the activity’s Overview page.
      • Click Save to save your changes and remain on that step where you can continue to make changes. Wait for the save to complete before making additional changes. The VEC reloads with the refreshed changes after the save is complete.
    • Edit Targeting: Takes you directly to the Targeting page (the second step in the guided workflow). Make your desired changes, then use the split button (explained above) to save the activity.

      • Click Save & Close to save your changes and display the activity’s Overview page.
      • Click Save to save your changes and remain on that step where you can continue to make changes. Wait for the save to complete before making additional changes. The VEC reloads with the refreshed changes after the save is complete.
    • Edit Goals & Settings: Takes you directly to the Goals & Settings page (the final step in the guided workflow). Make your desired changes, then use the split button (explained above) to save the activity.

      • Click Save & Close to save your changes and display the activity’s Overview page.
      • Click Save to save your changes and remain on that step where you can continue to make changes. Wait for the save to complete before making additional changes. The VEC reloads with the refreshed changes after the save is complete.

Work with legacy activities created in Recommendations Classic classic

The Activities list display activities created in various sources, including Recommendations Classic. The following actions are available when working with legacy activities created in Recommendations Classic:

  • Activate
  • Deactivate
  • Archive
  • Copy
  • Delete

You cannot edit a Recommendations activity directly. If you want to edit the activity, you should create a copy of the activity using Target Premium and then save the newly created activity. This newly created activity can then be edited as necessary.

Save an activity in draft form section_968CD7A63027432EBD8FAE3A0F7404C3

When you are creating a new activity that has not yet been saved, or you are editing an activity that was previously saved in draft form, the Save Draft options display in the split button.

You can save an activity in draft mode if the activity setup has been started but it is not ready to run.

  1. Create new activity or edit an existing activity that is in draft form.

  2. Select the desired option from the split button:

    Save Draft

    • Next: To edit another page in the three-step workflow, click Next to advance to the desired step.
    • Save Draft & Close: Make the desired changes on the current step, click the drop-down on the split button, then select Save Draft and Close to save your changes and display the activity’s Overview page.
    • Save Draft: Make the desired changes on a step, click the drop-down on the split button, then select Save Draft to save your changes and remain on that step.

Copying/Editing an Activity When Using Workspaces section_45A92E1DD3934523B07E71EF90C4F8B6

A workspace lets an organization assign a specific set of users to a specific set of properties. In many ways, a workspace is similar to a report suite in ÃÛ¶¹ÊÓƵ Analytics.

NOTE
Workspaces are part of the Properties and Permissions functionality available as part of the Target Premium solution. They are not available in Target Standard without a Target Premium license.

If you are part of a multi-national organization, you might have a workspace for your European web pages, properties, or sites and another workspace for your American web pages, properties, or sites. If you are part of a multi-brand organization, you might have a separate workspace for each of your brands.

For more information about workspaces and the Enterprise User Permissions functionality, see Enterprise User Permissions.

If you have Enterprise User Permissions enabled in your environment, you can copy activities to the same workspace or to another workspace. You cannot currently move an activity from one workspace to another. To copy an activity to another workspace, from the Activities page, hover over the activity you want to copy, click the Copy icon, then select the desired workspace from the drop-down list.

Consider the following information when using the copy/edit functionality with workspaces:

  • When you copy an activity within same workspace, the first step of the creation flow of the newly copied activity opens in edit mode.
  • When you copy an activity to a different workspace, the activity is copied to the other workspace without opening it in the activity creation flow. After the activity is copied successfully, a message displays indicating that the activity was copied successfully and includes a link to open the new activity.

If your environment does not have the Enterprise User Permissions functionality enabled, all activities open in edit mode before copying.

Best practices

  • As best practice, try updating the activity using the same method (UI or API) that was used to originally create the activity.

    Activities created using the Target UI should be updated via the Target UI. Activities created via API should be updated via API. If you originally create an activity using the API, for example, but then later edit the activity via the Target UI, not all changes are updated. All changes are stored on the backend and can be updated by making another API call.

recommendation-more-help
3d9ad939-5908-4b30-aac1-a4ad253cd654