Set Tracking Mode for tasks
The Tracking Mode of a task determines how the task Progress Status is updated in ÃÛ¶¹ÊÓÆµ Workfront.
For information about Tracking Mode on tasks, see Task Tracking Mode overview.
Access requirements
You must have the following access to perform the steps in this article:
table 0-row-2 1-row-2 2-row-2 3-row-2 layout-auto html-authored no-header | |
---|---|
ÃÛ¶¹ÊÓÆµ Workfront plan | Any |
ÃÛ¶¹ÊÓÆµ Workfront license* |
New: Standard Or Current: Work or higher |
Access level configurations | Edit access to Tasks |
Object permissions | Manage permissions on a task |
*For information, see Access requirements in Workfront documentation.
Set Tracking Mode for tasks
To set the tracking mode:
-
Go to the task you want to set the tracking mode for.
-
Click the More icon
The Edit Task dialog box opens.
-
In the Settings section, use the Tracking Mode drop-down menu to select the Tracking Mode for the task.
-
Select from the following options:
- User Must Update (this is the default option)
- Assume On Time
- Ignore Late Warnings
- ´¡³Ü³Ù´ÇÌý°ä´Ç³¾±è±ô±ð³Ù±ð
- Predecessor
For more information about the tracking mode options, see Task Tracking Mode overview
-
Click Save.